Welcome Customer !

Membership

Help

Dongguan Qingsheng Testing Equipment Co., Ltd
Custom manufacturer

Main Products:

ybzhan>Download Materials>The high and low temperature cyclic alternating test chamber makes your work easier,
Download

Dongguan Qingsheng Testing Equipment Co., Ltd

  • E-mail

    13826958603@139.com

  • Phone

    13826958603

  • Address

    Wutai Technology Park, Shijing Industrial Zone, Sangyuan, Dongcheng District, Dongguan City

Contact Now
The high and low temperature cyclic alternating test chamber makes your work easier,
Date: 2015-12-16Read: 12
This high-low temperature cyclic alternating test chamber adopts a high-precision microcomputer touch controller, combined with a high stability platinum temperature measurement antibody and a wind speed circulation system, to achieve uniform, accurate, and stable temperature control Can conduct environmental tests for high and low temperatures High and low temperature test box/machine, cold resistance test machine/box, high and low temperature alternating test box, high and low temperature cycle test machine/box, high and low temperature alternating test machine/box, high and low temperature damp heat test machine/box, programmable high and low temperature test machine/box, Dongguan test machine
  High and low temperature cyclic alternating test chamberProvide industrial parts, major accessories, semi-finished products, such as electronic parts, automotive parts, laptop computers, etc. for reliability and temperature and humidity environment testing
Design: Arc shaped and matte line treatment, integrated control panel, high-quality arc appearance and beautiful back design, and the use of flat non reactive handles, easy to operate, safe and reliable
A large rectangular observation window with a bright and wide field of view of 430x520mm, using fluorescent lamps to keep the inside of the box bright, and using embedded glass in the heating body, without the need for wipers to defog, to maintain clear observation of the conditions inside the test box at all times
Separation of humidification system pipeline and control circuit: The humidification system pipeline is separated from the power supply, controller, and circuit board to avoid affecting the circuit due to pipeline leakage and improve safety
The test time signal socket is embedded in the lower part of the left side of the box (rated current 2A)
Convenient automatic water supply device: a pre installed water supply tank is hidden in the lower part of the front of the test box for easy replenishment of water supply (with a capacity of about 20L)
This high and low temperature cyclic alternating test chamber is a Chinese/English programmable control system, which eliminates language barriers and makes operation more convenient The programmable control system high and low temperature test chamber can input the required temperature test point and test time at once, and automatically stop after the test is completed, making your work easy and simple
1. Structural characteristics of high and low temperature test box body
The design is aesthetically pleasing and elegant, with a non reactive handle that is easy to operate
The inner shell of the box is made of imported stainless steel (SUS304) mirror panel, and the outer shell of the box is made of A3 steel plate spray painted, which increases the appearance texture and cleanliness
The large observation window is equipped with lighting to keep the inside of the box bright, and uses tempered glass embedded in the heating body to observe the condition inside the box clearly at any time
The left side of the box is equipped with a 50mm diameter test hole, which can be used for external testing power or signal lines
2. Controller for high and low temperature cyclic alternating test chamber
The temperature control adopts a fully imported touch button instrument, with simple operation and setting
After inputting the data and experimental conditions, the controller has a locking function to prevent human touch from changing the temperature value
Equipped with P.I.D automatic calculation function, it can immediately correct temperature change conditions, making temperature control more stable
Optional printer
To ensure your personal safety, please wear work clothes and carefully read all the instructions and precautions in the manual before operation;
2. Turn on the power supply of the distribution cabinet;
3. Turn on the power and water supply switch of the cooling tower; (If it is air-cooled, this step is not required)
4. Close the 'main power' switch of the test chamber;
5. Press the 'power switch' on the front panel of the machine, and the control system will be powered on