-
E-mail
13538469076@163.com
-
Phone
13538469076
-
Address
Dongcheng Lixin Jinhui Industrial Park, Dongguan City, Guangdong Province
Guangdong Aisili Testing Instrument Co., Ltd
13538469076@163.com
13538469076
Dongcheng Lixin Jinhui Industrial Park, Dongguan City, Guangdong Province
Programmable constant temperature and humidityExplanation of Maintenance Procedures
1、 Cleaning and maintenance of water recycling bins
1. The supply water tank and water recovery water tank must be cleaned and maintained regularly (once every six months).
2. After removing the connecting screws of the water level control float ball assembly, it can be cleaned (once every six months)
3. After removing the six screws around the humidifier, clean the scale (once every six months).
Attention: Drain the furnace water and turn off the main power switch before disassembly
4. Maintenance of water quality filters
This component is a consumable material and needs to be replaced regularly (approximately once a year) depending on the quality of the water. On the contrary, if the water quality is poor or there are many cycles of water return, the replacement frequency will be higher
Attention: It is important to ensure the purity of the humidification water and to replace spare parts in stock.
2、 Wet ball gauze replacement
If it is found that the gauze has turned yellow and dirty, and its water absorption capacity is poor, it should be replaced immediately.
3、 Cleaning and maintenance of the radiator of the freezer
Powerful AIR can be used to remove dust and increase heat dissipation (once every six months).
4、 The testing area inside the machine should be kept clean at all times.
Aisili's corporate vision: to align with design standards and achieve success as a Chinese environmental testing instrument enterprise