In the mass production process of semiconductor chips, the performance stability under high and low temperature environments is a key factor determining product yield. Domestic leading semiconductor companies once faced the problem of high failure rates in the mass production of automotive grade chips, and introduced GuanghaotanThermal Shock ChamberLater, by accurately simulating high and low temperature cycling environments, the failure rate of chip mass production was significantly reduced, making it a reliable testing tool in the industry.

This semiconductor company mainly produces automotive grade and industrial grade chips. Previously, due to the slow temperature change rate and low temperature control accuracy of traditional testing equipment, it was impossible to simulate the working state of chips in the environment, resulting in frequent failures such as solder joint cracking and electrical performance drift caused by temperature stress after the chips were manufactured. Guanghao Tian has customized products with a wide temperature range of -60 ℃ to 150 ℃ to meet the needs of enterprisesThermal Shock ChamberIts temperature change rate can reach 30 ℃ per minute, with a conversion time of ≤ 5 seconds, which meets the AEC-Q100 automotive electronic testing standard of -55 ℃? +Strict requirements of 150 ℃.

With the temperature control accuracy of ± 0.5 ℃ and temperature uniformity of ± 1 ℃ in the cold and hot shock box, the enterprise has successfully identified the problem of mismatched thermal expansion coefficients in the chip packaging process. By optimizing packaging materials based on test data, the incidence of microcracks in chip solder joints was reduced by 40%, and the drift of electrical performance parameters was controlled within ± 10%. At the same time, the testing cycle has been compressed from the traditional 72 hours to 48 hours, and the efficiency of single batch testing has been improved by 30%. An additional 60 batches of testing are completed each year, and the chip factory yield has increased from 98% to 99.5%.