-
E-mail
sales@51082915.cn
-
Phone
13381632669
-
Address
Building 3, No. 77 Gangxing Road, Songjiang District, Shanghai
Shanghai Yacheng Instrument Equipment Co., Ltd
sales@51082915.cn
13381632669
Building 3, No. 77 Gangxing Road, Songjiang District, Shanghai
1. Connect the power supply. Attention: The phase and neutral wires cannot be connected incorrectly.
2. Connect the gas source to the air pipe joint on the lower side of the machine through a Φ 8PU tube.
3. Add coating solution to the liquid cylinder.
4. Turn on the power switch and turn on the power at this time.
5. Adjust the engine speed according to the instructions for using the engine speed controller.
6. Turn on the air inlet adjustment switch, and the air inlet fan will start working.
7. Adjust the temperature controller to the desired temperature value. If the actual temperature is lower than the set value, the heater power will be turned on and the heater will start heating. If the actual temperature is higher than the set value, the heater power is disconnected and the heater stops heating.
8. Turn on the spray gun switch, and the spray gun will start working. Please refer to the spray gun manual for instructions on how to use the spray gun.
9. After adjusting the above functions appropriately, the air compressor can be started with an air pressure of about 4-6kg/cm3.