Welcome Customer !

Membership

Help

Anhui Yufeng Intelligent Technology Co., Ltd
Custom manufacturer

Main Products:

ybzhan>Products

Anhui Yufeng Intelligent Technology Co., Ltd

  • E-mail

    2772803768@qq.com

  • Phone

  • Address

    Huagang Industrial Park, Hefei City, Anhui Province

Contact Now

Case study of GSP automated warehouse project in the pharmaceutical industry

NegotiableUpdate on 08/07
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Product Description: Product Description: YuFeng Intelligent Pharmaceutical Industry GSP Automated Warehouse Project Case Brief Introduction: This project is located in a pharmaceutical limited liability company in Hubei Province, China. The company plans to build an automated three-dimensional warehouse for GSP warehouse to achieve automatic storage, storage, automated outbound and information management of packaging codes, thereby reducing storage costs and ensuring safe operation

Product Details

Product Description:
Product Description
A brief introduction to the case of Yufeng Intelligent Pharmaceutical Industry GSP Automated Storage Project:
This project is located in a pharmaceutical limited liability company in Hubei Province, which plans to build a GSP warehouse automated three-dimensional warehouse to achieve automatic storage, storage, automated outbound and information management of packaging codes, thereby reducing storage costs and ensuring safe operation.
The project includes four functional areas: packaging area, robot code stamping area, automatic warehouse area, and front warehouse area. The overall design of the three-dimensional warehouse should consider small space occupation, compactness, economy, and meet the needs of customers visiting automated demonstrations.

The owner of this project adopts a "turnkey" project within the supply scope of Party B.


Product images
Product Picture

Product parameters:
Product Data
Operating environment: -10~45 ℃, relative humidity 20% -85% (no condensation water)
Assignment method: The operators are planned to work in two shifts, with each shift lasting 10 hours; Finished product storage takes 20 hours, finished product outbound takes 16 hours
Daily warehouse flow: 3 to 6 pieces of workshop products per minute are transported through a box conveyor line, and robots automatically code and stamp them into the warehouse. The speed of inbound and outbound is ≥ 20 discs/hour.
Tray cargo size: 1200mm * 1000mm * 0470) mm (length * width * height) The cargo does not exceed the tray
Weight of goods: 800kg. The maximum weight per box is 19kg
Product video:
Product Video
Detail advantages:
Product Advantage