-
E-mail
524852813@qq.com
-
Phone
18948178086
-
Address
5th Floor, Building 4, Xiangxiang Industrial Zone, Shiyan Street, Bao'an District, Shenzhen
Shenzhen Demaisheng Measurement and Control Equipment Co., Ltd
524852813@qq.com
18948178086
5th Floor, Building 4, Xiangxiang Industrial Zone, Shiyan Street, Bao'an District, Shenzhen
DOE Ceiling Fan Airflow Measurement Test DeviceSample fixture (center of roof): square shaped250 * 250 * 15mm (length * width * height) 3/16 24 tooth central circular hole power cord with a diameter of 20mm
2Variable frequency power supply: Power supply:0.5KAV, Voltage: 100V, 120V, 220V, 230V, 240V; 50Hz 60Hz switchable.
3Control device: computer (host)+The monitor is provided by the customer and is required to be specified in the configuration list.
4L frame manual lifting, stepper motor turning 0-90 °
5Point selection: Align the center of the room with the center of the sample hole of the ceiling fan, and ensure accurate internal dimensions; (It is fixed Laser alignment device is not required
6. Tachometer: Two bladed, three bladed, four bladed, and five bladed parameters automatically output data from the computer.
7. The overall external dimensions of the equipment (according to the standard) are 6.3 * 6.3 * 3.55m, and the internal dimensions are 6.1 * 6.1 * 3.35m. The standard acceptable error is within 0.75 feet, which is acceptable to customers(Adjusted based on the actual situation of the user on-site)
8Temperature is21.1±2.8°Chumidity50%±5%(Press)430 standard) After constant temperature and humidity, place the sample and turn it on for 15 minutes before testing.
9. Computer (host+monitor) configuration:
Win7 system, 64 bit hard drive:1T Memory:4G
CPU3.5G dual core four threadWith serial parallel port+Built in audio system
Resolution:1920 * 1080 size: 20 inches (or above)
10. Anemometer: Both domestic and imported brands of wind pressure type are required (test results meet the 430 standard)
11The air conditioner should be placed in the storage board, and customers should pay attention to the convenience of removing and cleaning the filter screen in the later stage. The air conditioning unit is located outside the room
12Control cabinet: located outside the room.
DOE Ceiling Fan Airflow Measurement Test DeviceIntroduction to Testing Equipment :
This air volume testing device is based onDOE 10 CFR Appendix U to Subpart B of Part 430-2018 New Standard Clause RequirementsThe laboratory requirements specified inside will meet the testing requirements of ceiling fan standards.
II technical specifications :
1Environmental temperature control:21.1± 5 ℃, humidity50%.Therefore, it is recommended to install the test shielding room in a room with central air conditioning or install independent air conditioning, and control the temperature outside the shielding roombelow21.1℃This can ensure that the testing requirements are met. This plan does not include the temperature control part of the experimental environment.
2. Installation device for ceiling fanCoaxial with the center of the ground rotation axis in the middle of the roof.
3. Anemometer:12 wind speed probes are installed on a rotating arm that can rotate around the axis according to the standard installation position.
III Device requirements :
1. The device should comply withDOE 10 CFR Appendix U to subpart B of part 430 -2018The standard requirements for air volume testing include reasonable design, high degree of automation, convenient use, durability, load-bearing and anti vibration capabilities;
2. Test scope: Ceiling fan(Customers only test ceiling fans)
It can automatically generate detection results and process curves, and print them out.
3Wind pressure anemometer, together12One. (Brand to be determined) The test results meet the requirements430 standard)
4The system should be equipped with a multifunctional electricity meter that can measure voltage, current (true RMS), and power 500VA variable frequency (± 1%) voltage regulating power supply, please refer to the configuration table for specific configuration;