-
E-mail
1095143601@qq.com
-
Phone
18936740760
-
Address
No. 358 Shenhua Avenue, Jinhu County Industrial Park
Jiangsu Hengke Measurement and Control Instrument Co., Ltd
1095143601@qq.com
18936740760
No. 358 Shenhua Avenue, Jinhu County Industrial Park
Application:
Dairy industry: condensed milk, lactose, cheese, dried cheese, lactic acid, etc;
Mining: coal, potash, salt water, phosphate, calcium compounds, limestone, copper, gold, etc;
Refining: lubricating oil, aromatic agents, fuel oil, vegetable oil, etc;
Food processing: tomato juice, grape juice, lemon juice, tomato sauce, molasses, vegetable oil, fruit syrup, jelly, jam, etc;
Pulp and paper industry: black pulp, green pulp, pulp cleaning, evaporator, caustic soda, etc;
Beverage processing: beer, soft drinks, fruit wine, instant coffee, malt, etc;
Chemical industry: caustic soda, acid, urea, cleaning agents, polymer density, ethylene glycol, sodium hydroxide, etc;
Petrochemicals: natural gas, oil and gas washing, kerosene, lubricating oil, oil/water interface, etc.
measurement range |
Range: 0-1.5g/cm3 Range: 2:0-2g/cm3
Range: 0-3g/cm3 |
accuracy class |
*:±0.001 g/cm3B 级: ±0.005 g/cm3
Grade C: ± 0.01 g/cm3 |
Stability within 12 months |
0.021×10-3 g/cm3 |
Environmental temperature impact (every 10 ℃) |
0.003×10-3 g/cm3 |
Static pressure effect (1kgf/cm) |
0.001 × 10-3 g/cm3. The system error is eliminated by calibration during static pressure |
Power supply impact |
± 0.005% calibrated range/volt |
Electromagnetic interference impact |
Design to meet IEC801 and European standards EN50081EN50082 |
merit |
temperature |
Pt1000(-40-3000℃) |
output signal |
Two wire system with 4-20mA/Hart output |
|
power supply |
Sensor power supply: 24V DC Converter power supply: 24V DC or 220V AC |
|
instruction |
LCD local display |
|
temperature range |
Environment: -40-85 ℃ Process: -40-100 ℃
Normal operation: -40-85 ℃ |
|
Startup time |
0.2 seconds |
|
humidity range |
0-RH |
|
temperature compensation |
Automatic Pt1000 |
thing |
process connection |
Sanitary type: 316L SST clamp connection Industrial type: 316L SST flange connection |
Liquid contact part |
316L、 Hastelloy and tantalum film are optional |
|
Non liquid contact part |
Filling fluid: Silicone oil (DC200/350, DC200/20, DC704) Syltherm800 or Glycerin/water |
|
structural form |
Installation method of pipeline or tank body |
1. First, confirm the unpacking items. Including: one meter head, two probes, two hoses (red and green) connected to the probes, a set of universal mounting brackets and accessories.
2. The density meter needs to be installed in an empty tank. When installing, first install the probe connected to the green hose into the upper part of the tank, and install the probe connected to the red hose into the lower part of the tank. Ensure that the two probes are installed vertically (perpendicular to the horizontal plane).
3. Install the header section through a universal bracket, ensuring that the header is perpendicular to the horizontal plane and positioned higher than the upper probe on the side of the tank.
Note: The header can be installed on the pipeline or flat plate through a universal mounting bracket.
4. Connect.
A: One end of the green hose is connected to the probe on the upper part of the tank, and the other end? 6. Connect the hose connector to the upper interface of the header (with text annotations at the header interface); One end of the red hose is connected to the probe at the bottom of the tank, and the other end? 6. Connect the hose connector to the lower interface of the header (with text annotations at the header interface); Between green and red hoses? The four connectors are connected to the air valve interface of the header part through a three-way joint (there is a text annotation at the header interface, regardless of top or bottom).
B: Connect the 4-8MPa air supply pipe to the compressed air interface in the header section (with text annotations at the header interface); Connect the 24V power cord to the meter head through the electrical interface.
Note: The above operations must be performed when there is no material in the tank.
5. Adjustment. After ventilation and electrification are completed, the feeding operation can be carried out. If there is some deviation between the actual value and the measured value of the density meter, the tightness of the screws on the flange of the side probe of the tank can be adjusted on site until it matches the actual density value.