-
E-mail
800053919@b.qq.com
-
Phone
13715391711
-
Address
526, Block E, Building 5, Software Industry Base, Nanshan District, Shenzhen
Shenzhen Gumei Technology Co., Ltd
800053919@b.qq.com
13715391711
526, Block E, Building 5, Software Industry Base, Nanshan District, Shenzhen
Starting from July 1st,A German company has announced new prices for raw materials, electrical components, energy, and logisticsAll increase,In the future, industrial automation products from various countries around the world may also experience a wave of growth. As a result, there have been many domestic incidentsSet off a wave of domestic parity substitution.
(Information sourced from the internet)
Domestic substitution is urgent
COOLMAY
Previously, there was a severe shortage of automation industrial control products, leading to market confusionChaos.
the near future,especiallyEthernet/IPofExpansion modules are even moreSerious shortage of stockManyMerchantsMassive stockpiling of goodsBuying second-hand productsMany people ask, what other brands are available for supply?
???
![]()
I have to mention Gu Mei Technology here, forAccurately targeting user needsGu Mei has created a feasible solutionMultiple slave stations cascadedThe L02Ethernet/IP module, used forimplementmore efficientData exchange has a very wide application market.
It's Siemens, ABB、AB、 The first choice for domestic and affordable replacement of EtherNet/IP bus I/O modules for PLCs such as Keyence and Omron.
Not only that, Gu Mei alsowarrantableLong term stable supplyTruly achievingAfter retailcost issue,bigreduceThe enterprise'scost.
Gu Mei L02-EIP module
COOLMAY
In fact, the L02-EIP module is equivalent to a gateway adapter, which can be connected toDifferent types of EtherNet/IP master stationsThe configuration method and software used are different.Note that L02-EIP needs to be used with L02 series I/O modules.
01 Product Overview
▲ L02-EIP module will provide communication interface、 The I/O expansion interface is designed as a highly integrated single module with a structuretightgather, Performancestable, possessingSuper cost-effective.
▲ Currently, The L02 series modules have been widely used in various industrial automation scenarioshigh stability, anti-interferencehighly capable, PerformanceexcellentReceived high praise from users.
02 Features
? branchHolding EtherNet/IP protocoldiscuss
? RostadineSystem, guaranteelongStable supply during the periodgoods
Maximum ScalabilityDI/O 512 points, AI/O 50 points
? achievableL02 cascaded with multiple slave stationsEthernet/IP module
? SupportCollaborate with multiple mainstream EtherNet/IP master stationsseamless connection
03 system architecture
① The communication bus protocol adopts the standard EtherNet/IP communication bus, which can easily communicate with PLCs or industrial computers using the EtherNet/IP protocol.
② Communication interface methodfor2 RJ45 100MbpsEthernet interface and internal implementationPort switching function,no needin additionAdd switchesIt can be easily achievedMultiple slave stations cascaded.
Affordable alternative solutions
Efficient Industrial Network System
COOLMAY
Next, let's talk about the L02-EIP moduleOmron NX1P2Usage on PLC.
(Note: Can be used on PLCs such as Gumei L02, Keyence KV-7500, Panasonic FP7, and Omron NX1P2)
01 NX1P2 PLC and L02-EIP communicate via EtherNet/IP
Used in this exampleNX1P2 PLC as the main controlThe connected module is L02-EIP, and the specific operation steps are as follows.In practical applications, please connect the hardware circuit in advance.
(1) Configure IP
①Open the built-in EtherNet/IP port settings, configure the local IP address
![]()
②Add a public global variable of data type WORD and an output global variable of network open type as input, respectively
(2) EtherNet/IP Connection Settings
①Tools>EtherNet/IP Connection Settings
![]()
② Double click the PLC name to open the settings
![]()
③ Right click on the target device in the toolbox on the right and select 'Display EDS Library'
④ Click Install and select the EDS file installation for eth-v1.5-weidmueller-ur20-fbc-EIP
⑤ InstallationUR20-FBC-EIP will appear in the list of completed devices
![]()
(3) Add target device
① Close the dialog box and click the+button under the target device to add the target device
② LosingEnter the IP address of the target device, select the model name of the newly added UR20-FBC-EIP, and choose the version number
![]()
③ Click(Add)The button completes the addition, and the target device appears as the device we just added
④ Double click UR20-FBC-EIP to add device, set node address and IP
![]()
(4) Register variables
① Note:Register variables, click on 'Register All' in the tag group
![]()
② Register the global variable we just created
③ The variable we created appears in the input/output list
④ Click on the connection icon on the left
![]()
⑤ Double click the target device that was just added
![]()
⑥ Fill in 101 in the target variable and select EIP_IN as the starting variableFill in 102 as the target variable for output, and select EIP_OUT as the starting variable
![]()
⑦ Download to PLC, be sure to download EtherNet/IP connection settings together
⑧ Open the monitoring window and connect the input to the module. At this time, the value of EIP_IN will change in real-time. Modifying the value of EIP_OUT will also cause the module's output to change accordingly.
About Coolmay Gu Mei?
Established in 2006, WeChat name: Coolmay
PLC all-in-one machine | PLC | Touch screen | Industrial Internet of Things module | Frequency converter
Product information download for automation solutions: www.coolmay.com
National Technical Service Hotline:
/86960332/26051858/26400661