Welcome Customer !

Membership

Help

Shanghai Huitao Automation Equipment Co., Ltd
Custom manufacturer

Main Products:

ybzhan>Products
Product Categories

Shanghai Huitao Automation Equipment Co., Ltd

  • E-mail

    2081788225@qq.com

  • Phone

    15921758826

  • Address

    A568, 4th Floor, Building 4, No. 2312 Weiqing East Road, Shanyang Town, Jinshan District, Shanghai

Contact Now

Testing steps for radiator gravel impact testing machine

NegotiableUpdate on 01/09
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The testing steps of the radiator gravel impact testing machine are to place gravel or other media in the feeding hopper, and the vibrating feeding device in the feeding hopper sends the material to the feeding chute. The vacuum generated by the high-speed air below causes the medium to fall into the feeding chute. The medium is sucked into the nozzle and emitted onto the sample by the air injector. The medium collided with the sample and fell into the gravel box.
Product Details

Testing steps for radiator gravel impact testing machine

Testing steps for radiator gravel impact testing machine



Radiator gravel impact testing machine

One,summary:

Suitable for gravel impact testing of automotive radiators.

2、 Testing standards

QC/T 468Automobile radiator

3、 Equipment testing and principle introduction

Principle:

Gravel or other media are placed in the feeding hopper, and the vibrating feeding device in the hopper sends the material to the feeding chute. The vacuum generated by the high-speed air below causes the medium to fall into the feeding chute. The medium is sucked into the nozzle and emitted onto the sample by the air injector. The medium collided with the sample and fell into the gravel box.

Experiment:

The test object is the radiator core part, continuously sprayed:Usually only sprayed once.

The hardness of the quenched steel shot is61HRC~65 HRC, with sharp edges and an average diameter4mm~5m.

The specific experimental parameters are shown in the table11The regulations.


4、 Working conditions and venue requirements

Working conditions:

1Operating temperature: room temperature

2Power supply: AC/single-phase220V±15% /50Hz

3Compressed air pressure:0.4MPa0.8MPa(Users can customize, or customize higher pressure to meet testing conditions)

Venue requirements:

1The ground is flat and well ventilated

2Does not contain flammable, explosive, corrosive gases and dust

3There is no strong electromagnetic radiation source nearby

4Ground bearing capacity of the venue: not less than300kg/m2

Electrical requirements

1The equipment design conforms to the principle of human-machine interaction, is easy and safe to operate, and is overall sturdy and reliable;

2The equipment is equipped with a power cut-off valve to ensure that there is no danger during maintenance;

3The operation control system is placed in a location that is convenient for the operator to operate and observe. The device must be equipped with an emergency stop button

4The equipment should have good and comprehensive safety protection measures, and the rotating parts, dangerous components, and dangerous parts on the equipment should have protective devices and safety signs;

5Electrical control system of equipment,Equipped with overload protection and short circuit protection functions.

5、 Technical parameters

PLCcontrol system

Operation interface: Switch between Chinese and English;

Testing software: can be remotely upgraded for free

Spray time can be set0-999Set the pause time for spraying in seconds

funnelMade of stainless steel

The control system and sample box are separable, flexible, and can be moved to any position as desired

additional allocationPneumatic vibration system

Jet mediumcustomer-provided

One set of sample device: customized sample size:ZUIbig1200mm*1200mm *68mm(Length and Width),ZUISmall size:300*300*32mm;

Sample holder: manually move the sample, manufacture material steel pipe welding;

Sample weight:20-30KG

Particle size:45Du Gun-0-29mmand90Du Gun0-52mm

Adjustable spray speed0-1MPA

Adjustable emission quantity

Pressure regulation range0-1000KPa

Range of emission adjustment≥1kg/min

Range of emission angle adjustment 4590°;

Overall dimensions:2930*2680*2050mm

6、 Supply List

host1Taiwan

Sample device1set

Silencing componentTheSAESpray gun componentsTheVDASpray gun components1set

eye mask1width

earphones1a

steel ball500gram

wrench1set

power cord1root

Instruction Manual1copy

Certificate of Conformity1copy

Warranty Card1copy

nameplate1copy

7、 Equipment configuration

name

Specifications

brand

unit

quantity

human-computer interaction

touch screen

Weintek

Taiwan

1

PLC

CPUmodule

Leading control

Taiwan

1

pressure sensor

0~1.0MpaAccuracy: ±0.5%FS

Shanghai Jiamin

a

1

Feeding vibrator

GT10

Nationally Recognized Excellence

a

1

pressure regulating valve

0~1.0MPa

SMC

a

1

alarm light

Φ22buzzer

Nationally Recognized Excellence

a

1

power cord

RVV3*1.5mm²

Nationally Recognized Excellence

a

1

Jet host


independently developed

Taiwan

1

Sample external device


independently developed

set

1

8、 Installation, debugging, training, and acceptance

1After the goods arrive at the demander, both parties shall jointly confirm the integrity of the goods. The supplier shall deliver the equipment to the designated location for installation and commissioning according to the demander's requirements.

2The supplier shall provide free training for the relevant personnel of the demander. The content includes the normal use, maintenance, fault analysis and troubleshooting, operational safety, and emergency handling procedures of the equipment.

3Equipment acceptance: After receiving the equipment, the purchaser shall conduct acceptance according to the technical agreement signed by both parties. The equipment acceptance shall meet the standard requirements and achieve normal performance before completion. Both parties shall issue an acceptance report.

9、 After sales warranty period and service

1SupplierThe quality assurance period for its equipment is12Months, calculated from the date of self acceptance or deemed acceptance.

2Within the warranty period,The supplied equipment has quality problems within the operating procedures (excluding human factors caused by Party A and force majeure),supplierResponsible for free maintenance of equipment until the end of the warranty period.

3After the warranty period,The second party shall still be responsible for the maintenance and repair of the equipment, but shall only charge reasonable working hours and transportation expenses. For the replacement and purchase of equipment related accessories, the second party shall only charge the cost of the accessories.




Similar Product Recommend