-
E-mail
2081788225@qq.com
-
Phone
15921758826
-
Address
A568, 4th Floor, Building 4, No. 2312 Weiqing East Road, Shanyang Town, Jinshan District, Shanghai
Shanghai Huitao Automation Equipment Co., Ltd
2081788225@qq.com
15921758826
A568, 4th Floor, Building 4, No. 2312 Weiqing East Road, Shanyang Town, Jinshan District, Shanghai
Testing steps for radiator gravel impact testing machine
Testing steps for radiator gravel impact testing machine
Radiator gravel impact testing machine
One,summary:
Suitable for gravel impact testing of automotive radiators.
2、 Testing standards
QC/T 468Automobile radiator
3、 Equipment testing and principle introduction
Principle:
Gravel or other media are placed in the feeding hopper, and the vibrating feeding device in the hopper sends the material to the feeding chute. The vacuum generated by the high-speed air below causes the medium to fall into the feeding chute. The medium is sucked into the nozzle and emitted onto the sample by the air injector. The medium collided with the sample and fell into the gravel box.
Experiment:
The test object is the radiator core part, continuously sprayed:Usually only sprayed once.
The hardness of the quenched steel shot is61HRC~65 HRC, with sharp edges and an average diameter4mm~5m.
The specific experimental parameters are shown in the table11The regulations.
4、 Working conditions and venue requirements
Working conditions:
1Operating temperature: room temperature
2Power supply: AC/single-phase220V±15% /50Hz
3Compressed air pressure:0.4MPa~0.8MPa(Users can customize, or customize higher pressure to meet testing conditions)
Venue requirements:
1The ground is flat and well ventilated
2Does not contain flammable, explosive, corrosive gases and dust
3There is no strong electromagnetic radiation source nearby
4Ground bearing capacity of the venue: not less than300kg/m2
Electrical requirements
1The equipment design conforms to the principle of human-machine interaction, is easy and safe to operate, and is overall sturdy and reliable;
2The equipment is equipped with a power cut-off valve to ensure that there is no danger during maintenance;
3The operation control system is placed in a location that is convenient for the operator to operate and observe. The device must be equipped with an emergency stop button
4The equipment should have good and comprehensive safety protection measures, and the rotating parts, dangerous components, and dangerous parts on the equipment should have protective devices and safety signs;
5Electrical control system of equipment,Equipped with overload protection and short circuit protection functions.
5、 Technical parameters
PLCcontrol system
Operation interface: Switch between Chinese and English;
Testing software: can be remotely upgraded for free
Spray time can be set0-999Set the pause time for spraying in seconds
funnelMade of stainless steel
The control system and sample box are separable, flexible, and can be moved to any position as desired
additional allocationPneumatic vibration system
Jet mediumcustomer-provided
One set of sample device: customized sample size:ZUIbig1200mm*1200mm *68mm(Length and Width),ZUISmall size:300*300*32mm;
Sample holder: manually move the sample, manufacture material steel pipe welding;
Sample weight:20-30KG
Particle size:45Du Gun-0-29mmand90Du Gun0-52mm
Adjustable spray speed0-1MPA
Adjustable emission quantity
Pressure regulation range0-1000KPa
Range of emission adjustment≥1kg/min
Range of emission angle adjustment 45~90°;
Overall dimensions:2930*2680*2050mm
6、 Supply List
host1Taiwan
Sample device1set
Silencing componentTheSAESpray gun componentsTheVDASpray gun components1set
eye mask1width
earphones1a
steel ball500gram
wrench1set
power cord1root
Instruction Manual1copy
Certificate of Conformity1copy
Warranty Card1copy
nameplate1copy
7、 Equipment configuration
name |
Specifications |
brand |
unit |
quantity |
human-computer interaction |
touch screen |
Weintek |
Taiwan |
1 |
PLC |
CPUmodule |
Leading control |
Taiwan |
1 |
pressure sensor |
0~1.0MpaAccuracy: ±0.5%FS |
Shanghai Jiamin |
a |
1 |
Feeding vibrator |
GT10 |
Nationally Recognized Excellence |
a |
1 |
pressure regulating valve |
0~1.0MPa |
SMC |
a |
1 |
alarm light |
Φ22buzzer |
Nationally Recognized Excellence |
a |
1 |
power cord |
RVV3*1.5mm² |
Nationally Recognized Excellence |
a |
1 |
Jet host |
independently developed |
Taiwan |
1 |
|
Sample external device |
independently developed |
set |
1 |
8、 Installation, debugging, training, and acceptance
1After the goods arrive at the demander, both parties shall jointly confirm the integrity of the goods. The supplier shall deliver the equipment to the designated location for installation and commissioning according to the demander's requirements.
2The supplier shall provide free training for the relevant personnel of the demander. The content includes the normal use, maintenance, fault analysis and troubleshooting, operational safety, and emergency handling procedures of the equipment.
3Equipment acceptance: After receiving the equipment, the purchaser shall conduct acceptance according to the technical agreement signed by both parties. The equipment acceptance shall meet the standard requirements and achieve normal performance before completion. Both parties shall issue an acceptance report.
9、 After sales warranty period and service
1SupplierThe quality assurance period for its equipment is12Months, calculated from the date of self acceptance or deemed acceptance.
2、Within the warranty period,The supplied equipment has quality problems within the operating procedures (excluding human factors caused by Party A and force majeure),supplierResponsible for free maintenance of equipment until the end of the warranty period.
3、After the warranty period,The second party shall still be responsible for the maintenance and repair of the equipment, but shall only charge reasonable working hours and transportation expenses. For the replacement and purchase of equipment related accessories, the second party shall only charge the cost of the accessories.