Welcome Customer !

Membership

Help

Guangzhou Zijing Purification Equipment Co., Ltd
Custom manufacturer

Main Products:

ybzhan>Products

Guangzhou Zijing Purification Equipment Co., Ltd

  • E-mail

    52047082@qq.com

  • Phone

    13928758616,15989000960

  • Address

    No. 20 Longcheng Development Zone, Dalong Village, Panyu District, Guangzhou City

Contact Now

ZJ1175FFU purification unit

NegotiableUpdate on 04/15
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
Model ZJ-FFU-1175 (ZJFFU1175) Dimensions W1175 * L575 * H250 Filter Size W1170 * L570 * H69 Cleanliness Level 100 @ 0.3um (Federal Standard) Rated Airflow 1050m ³/h ± 20% Suitable for ZJ-FFU-1175 Application Fields: Widely used in semiconductor, electronics, flat panel display, disk drive manufacturers, optical, biological industries, clean production lines, clean workbenches, clean rooms
Product Details

Model ZJ-FFU-1175(ZJFFU1175)
Dimensions W1175 * L575 * H250
Filter size W1170 * L570 * H69
Cleanliness level 100 @ 0.3um (US federal standard)
Rated air volume 1050m ³/h ± 20%

ZJ1175FFU广泛应用于半导体、电子、平板显示器、磁盘驱动的厂家和光学、生物工业等,洁净生产线、洁净工作台、洁净室、组装式洁净室和层流罩等地方。

Suitable for ZJ-FFU-1175 application fields: widely used in manufacturers of semiconductors, electronics, flat panel displays, disk drives, optical and biological industries, clean production lines, clean workbenches, clean rooms, modular clean rooms, laminar flow hoods, and other places.

ZJ-FFU-1175侧面特写照片

The hundred level FFU laminar flow hood has a long working time, low noise, maintenance free, low vibration, stepless speed regulation, uniform wind speed, and easy installation.
The Class 100 FFU laminar flow hood can be modularly connected and used, making FFU widely used in cleanrooms, cleanroom workstations, cleanroom production lines, assembled cleanrooms, and local Class 100 applications.

zjffu1175无隔板高效过滤器

1175FFU purification unit features:
1. FFU external dimensions (mm): 1175 * 575 * 320, exquisite appearance;
2. The hundred level FFU laminar flow hood box and high-efficiency filter adopt a split design, making installation and replacement more efficient and convenient;
3. The Class 100 FFU laminar flow hood fan adopts a Taiwan direct drive centrifugal fan, with a working time of over 100000 hours;
4. A hundred level FFU with features such as energy saving, centralized computer control, stable operation, low noise, and digital adjustment;
5. The Class 100 FFU adopts a unique air duct with uniform wind speed, and the entire air outlet surface is uniformly sent out at a wind speed of 0.45m/s-0.75m/s;
6. The shell of the Class 100 FFU can be made of mirror stainless steel, aluminum zinc plated plate, or cold plate electrostatic spraying to create a beautiful and elegant appearance;
Before leaving the factory, FFUs are scanned and tested one by one using a laser particle counter according to the US Federal Standard (209E) to ensure quality;
FFU is suitable for cleanrooms ranging from 10 to 100000 levels, facilitating centralized control of overall operation;
FFU is highly suitable for large-scale use. Quickly occupy the market with unique advantages and reasonable prices;
Note: Our hundred level FFU adopts the international top technology TLF golden ratio technology, with exquisite appearance, superior quality, reasonable price, and no delivery period. (Our company solemnly promises that if any hundred level FFU purchased from our company has quality problems within one year, it will still be replaced - the only one in the industry!)! )

ZJ-FFU-1175技术参数

(ZJ-FFU-1175 Technical Parameters)

1175FFU purification unit usage environment:
>>Surrounding temperature: 5 ℃~40 ℃
>>Humidity: below 85% RH (without condensation of moisture)
>>Surrounding air: general indoor air
>>Cleanliness level: 100-10
>>Please avoid continuous and repeated ON/OFF operation of the machine body
If the fan filter unit is used in an environment that does not meet the above conditions, it will affect the performance of the product and may cause electrical short circuits, resulting in damage to electrical components and shortening the service life of the product.

ffu安装效果图

Installation rendering of FFU in clean workshop

Transportation and installation of 1175FFU purification unit:
>>Please handle the products in a well packaged state with the fan filter unit, and be sure to keep them level during transportation. If using lightweight carts or other tools for transportation, please choose a cart with a platform that exceeds the width of the body packaging.
>>After installation, at least 30 centimeters of space must be reserved above the body for future maintenance. Without sufficient maintenance space reserved, the body will not be able to be repaired or parts replaced.
>>Before trial operation, please remove the protective film attached to the suction port and under the flow plate.

Related products: