-
E-mail
szpeng88@163.com
-
Phone
13714836101
-
Address
Building B, No. 3, 3rd Road, Yangyong Industrial Zone, Songgang Street, Bao'an District, Shenzhen
Shenzhen Ruitaier Technology Co., Ltd
szpeng88@163.com
13714836101
Building B, No. 3, 3rd Road, Yangyong Industrial Zone, Songgang Street, Bao'an District, Shenzhen
Product Usage:
Dust test chambers are used for low-voltage electrical appliances, motors, instruments, meters, lighting fixtures, household appliances, and other products. They are often affected by sand and dust environments during storage, transportation, and use. The equipment uses artificial simulation of sand and dust environments to test the dust resistance of the test samples. Dust test chambers are used for LED lighting fixtures, low-voltage electrical appliances, motors, instruments, household appliances, and other products, and are often affected by sand and dust environments during storage, transportation, and use. Especially for automobiles and electrical appliances, the impact of sand and dust is more significant. This dust test chamber cannot meet the sand and dust tests with wind sources in GB2423 and GJB150
Product features:
The dust-proof test chamber can provide a non laminar vertical circulation airflow for dust carrying, and can control the circulation of dust carrying airflow, start, stop, automatic timing or continuous control. It can be used for various performance tests such as dust blowing, dust reduction, temperature, etc., making it an ideal dust-proof test equipment.
Structure of dustproof test box
Studio size: approximately 1500 x 800 x 1000mm (depth x width x height)
Inner box material: A3 steel plate baked paint
Outer box material: SUS304 # stainless steel plate
The box door is equipped with a large observation window and a manual scraper
Unique air duct design ensures that the sand and dust test chamber generates non layered vertical circulating airflow

Dust proof test box parameters (IP6X IP5X)
1. Environmental temperature: 5 ℃~+32 ℃
2. There should be no corrosive gases or flammable or explosive atmospheres around; No strong magnetic field interference
3. Voltage AC 220V ± 10%; Frequency: 50Hz ± 5%;
4. Good ventilation but no strong winds blowing directly
5. Ensure that the indicators are used normally. The ambient temperature should be ≤ 28 ℃ and the ambient humidity should be ≤ 85% R.H
Temperature range: ambient temperature+15~+40 ℃ (for dust dehumidification)
Humidity range: relative humidity
The dust concentration inside the box and pipeline is 2Kg/m?
Dosage of talcum powder: 2kg/m? , recyclable
Dust requirements: The dust used should contain 1kg of dry quartz sand, with particle distribution as follows: a. Through 150 μ m pore size, 104 μ m wire diameter: 99%~100%; b. Through 105 μ m aperture and 64 μ m wire diameter: 76%~86%; c. By using a 75 μ m aperture and a 52 μ m wire diameter: 60%~70% (the test dust should be provided by the customer)
Nominal wire diameter: 50um
Nominal spacing between lines: 75um
Airflow velocity: not greater than 2m/s
Wind path components: centrifugal fan
Box load capacity: The tested product in the dust test box shall not exceed 40 kilograms
Introduction to the Control System of Dust Prevention Test Chamber:
The programmable controller of the sand and dust testing machine can individually or collectively control the blowing fan, dust vibration, and total testing time. The maximum test time is 99 hours and 59 minutes. Adjustable wind speed inside the box (automatically adjusted through a frequency converter) and functions of the main components of the sand and dust testing machine
1. The main controller of the equipment adopts imported PLC program to control the LCD display screen, and displays the working time in full Chinese;
2. Equipped with vacuum actuators, Schneider actuators;
3. The time of the dust blower is automatically alternated;
4. The vibration and stop vibration time automatically alternate;
5. The dust blower, dust vibration, and total test time can be controlled separately;
6. This controller has the following arbitrary setting control functions
a. Dust blowing time (stop, blow): Choose any time setting for continuous or periodic dust blowing
b. Vibration time: The vibration and stop vibration times automatically alternate, with adjustable vibration times of 99 minutes and 59 seconds
c. Preset test time: The maximum test time is 99 hours and 59 minutes
d. Power on: disconnect disconnect disconnect 7. Non fuse protection switch, over temperature, overload, leakage, fully sheathed terminal block, with automatic shutdown protection, etc.
The dust test chamber of this experiment meets the national electrical safety standards, wiring specifications, and all wiring ports are clearly marked without exposure. The studio is absolutely insulated from all power sources, ensuring safety and reliability. Complete safety protection functions (as follows): reliable grounding protection device. Leakage/circuit breaker protection. Overload fuse protection. over temperature protection
Equipment acceptance:
At the installation site designated by the user, after the equipment is installed and debugged and can work normally, the equipment shall be inspected and accepted according to relevant standards and this technical agreement;
Check whether the appearance and configuration of the equipment meet the requirements according to the technical agreement;
After the technical specifications of the no-load and load test machines and equipment meet the requirements specified in the technical agreement, both parties shall sign the final acceptance report;
After the installation and debugging of the device is completed, relevant technical personnel will receive free basic operation training at the user's site, with no limit on the number of people;
Service Objective:
We provide high-quality products and services that meet and exceed customer expectations, ensuring customer satisfaction;
Our commitment to customers starts with understanding their needs and operates efficiently at all stages until timely delivery;
We make unremitting efforts to improve and innovate, making the quality management system operate more effectively;
Our employees work together to establish close customer relationships;
Our company promises to respond to customer calls within 1 hour. If technical service personnel need to be sent to the site for resolution, we promise to dispatch personnel within 24 hours (except for special circumstances such as statutory holidays)