Welcome Customer !

Membership

Help

Guangzhou Shenghao Intelligent Machinery Equipment Co., Ltd
Custom manufacturer

Main Products:

ybzhan>Products

Guangzhou Shenghao Intelligent Machinery Equipment Co., Ltd

  • E-mail

    shenghao8@163.com

  • Phone

    18620414188

  • Address

    No. 19, Zhenshun Street, Jianggao Town, Baiyun District, Guangzhou City, Guangdong Province

Contact Now

KST-160 Triangle Bag Tea Packaging Machine

NegotiableUpdate on 04/25
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
Detailed introduction of KST-160 triangular bag tea packaging machine. Applicable scope: packaging of bag brewed granular beverages such as green tea, black tea, black tea, oolong tea, yellow tea, white tea, flower tea, formula tea, health tea, health tea, traditional Chinese medicine tea, coffee, goji berries, mulberry leaves, and Chinese medicine decoction pieces
Product Details
detailed introduction

KST-160 Triangle Bag Teapackaging machine

Scope of application:

Green tea, black tea, black tea, oolong tea, yellow tea, white tea, flower tea, formula tea, health teahealth teaChinese herbal tea, coffeeGoji berries, mulberry leaves, and traditional Chinese medicine decoction piecesWaiting Bag Bubble StylegranularPackaging of beverages.

Local features:

  1. Used for flat packaging, triangular three-dimensional packaging and other products, it is easy to switch between flat packaging and triangular three-dimensional packaging with just one button.

  2. The packaging capacity reaches 3000 bags per hour (actual capacity depends on material characteristics).

  3. This machine can use packaging rolls with wires and labels.

  4. Electronic configuration based on material characteristicsscaleMeasurement and cutting system, electronicscaleThe cutting system is suitable for single material, multiple material, irregularly shaped material, and other materials that cannot be weighed by general measuring cups. ElectronicscaleThe cutting system can flexibly separate and control the measured weight of each scale according to requirements.

  5. The precision rotary table measuring and cutting method can measure accurately and greatly improve the production efficiency of the equipment.

6. Touchscreen human-machine panel,MitsubishiPLC controller, using servo motor bag making, provides complete setting function, can adjust multiple parameters according to needs, providing users with maximum operational flexibility.


Configuration Details



Whole machine photo:



Sample image:



Main configuration list of electrical and pneumatic components




After sales service, technical support, and training


After sales service specific instructions:


1. Our company should dispatch experienced and healthy personnelcall, name, say, weighTechnical personnel provide technical services at the work site.

2. Our company is responsible for equipment debugging, technical training, and other related work. Our company should complete the training and assessment of 2 technical personnel appointed by Party A on site before the installation of the equipment.

3. Both parties agree that through online video communication, they can better support Party A's on-site production, operation, maintenance, and repair work, achieving timely, efficient, and fast service from our company. To achieve the above objectives, Party A will ensure that the equipment usage site has the conditions for online video conferencing. At the same time, our company promises to reply to Party A's service requirements within 30 minutes and organize experts to assist and support Party A's on-site work through online video, so that our company can accurately and intuitively understand the on-site situation and problems in the first time, and directly guide on-site problem-solving.

4. In order to improve the operational efficiency of the equipment on the site of Party A and reduce the failure rate of the equipment, our company promises to regularly send personnel free of charge to Party A's site for proactive follow-up within two years after the contract is signed, to understand the operation of the equipment, and provide technical support and services. Similarly, Party A promises that all personnel operating and maintaining the equipment must be trained and assessed by our company and have obtained a certificate of qualification issued by our company.

5. Within 10 days after the contract takes effect, Party A will provide our company with (the roll film/cans and materials provided by Party A for testing, sealing and final product packaging that are consistent with Party A's packaging site) for equipment debugging at our manufacturing plant and on-site testing and acceptance by Party A before equipment shipment. The transportation costs of materials and packaging materials shall be borne by Party A.

6. When the equipment arrives at the site of Party A, if there is any damage or loss of packaging boxes or items, Party A must notify our company and work with the carrier to jointly verify and confirm the damage or loss of the equipment. Otherwise, our company is not responsible for the damage or loss of the equipment.

7. After the equipment arrives at the site of Party A, both parties shall open the box, count and sign for the "Equipment Delivery Open Box Receipt" together. Party A shall be responsible for moving the equipment to the installation site and placing it in place, and the cost shall be borne by Party A. The equipment counted by both parties and signed for by Party A shall belong to Party A. The vulnerable and consumable parts (such as ribbons, fuses, belts, etc.) required for the installation, commissioning and trial operation of the equipment on Party A's site shall be provided by Party A.

8. The first party shall complete the following tasks before our company implements installation and commissioning: the necessary items for the commissioning equipment that belong to the first party's implementation, as well as other necessary conditions beyond the items listed in this contract that are not undertaken by our company, so that our company can enter commissioning normally. If the installation or commissioning is delayed or the equipment is damaged due to the fault of Party A, Party A shall bear the losses caused thereby (including travel and accommodation expenses incurred by our installation and commissioning personnel for unplanned installation and commissioning).

9. Our company must be responsible for equipment debugging and ensuring that the equipment meets the quality indicators stipulated in this contract. If the equipment cannot be installed and debugged due to the fault of Party A, our company should understand and cooperate with support. If Party A agrees that installation and commissioning cannot be carried out within thirty days after our written notice, the equipment shall be deemed to have passed the acceptance inspection. At the same time, both parties understand that our company's planned resources need to be rearranged and adjusted. For the installation and commissioning time of this project, it shall be based onThe actual situation of our company shall be determined by both parties separatelyRecognize.