Indoor and outdoor LED display screens are used in two different environments, and their installation methods and brightness function parameters are different. Below, we, Shenzhen Weifeng Technology LED electronic display screen manufacturer, will introduce indoor and outdoor to youLED displayThe installation method.
Indoor LED display screenInstallation method:
1. Wall mounted (adhesive wall mounted) is suitable for display screens within 10 square meters. The wall requirement is to have concrete beams on the actual wall surface or suspended. Hollow bricks or simple partitions are not suitable for this installation method.
2. Rack mounted is suitable for screens over 10 square meters and is conducive to maintenance. Other specific regulations are the same as those for wall mounted installations.
3. High altitude lifting: Suitable for screens within 10 square meters, this installation method must have a suitable installation position, such as a crossbeam or beam crossing on top. And the screen usually requires a back cover.
4. Seat: Removable Seat: Refers to a base that is independently processed. Placed on the ground, it can also be moved Fixed seat installation: refers to a fixed seat frame that is connected to the ground or wall.
Installation method of outdoor LED display screen:
1. Column type: Column installation is suitable for the installation of LED display screens on open spaces, where outdoor screens are mounted on vertical poles. The upright pole is divided into single column and double column. In addition to making the steel structure of the screen, concrete or steel upright poles also need to be made, taking into account the basic geological conditions.
2. Inlaid: Inlaid construction is suitable for display screen engineering projects that have already been included in building design and planning. When constructing civil engineering projects, the installation space for the display screen should be reserved in advance. During specific installation, only the display screen steel structure frame needs to be made to embed the display screen in the building wall, leaving enough maintenance space behind.
3. The usual installation method for rooftop style is to fix screws on the wall, fix the frame structure, install the screen inside the frame structure, connect the power cord, ribbon cable, and light up the debugging program.
4. Seat installation: The seat installation structure is to use a concrete structure on the ground to build a wall that is sufficient to support all LED display screens. A steel structure is built on the wall to install the display screens, and an 800 millimeter maintenance space is reserved for the steel structure project to place relevant machinery and maintenance equipment.