Welcome Customer !

Membership

Help

Yancheng Huihong Water Supply Equipment Co., Ltd
Custom manufacturer

Main Products:

ybzhan>Products
Product Categories

Yancheng Huihong Water Supply Equipment Co., Ltd

  • E-mail

    jhhh88@126.com

  • Phone

    18862053399

  • Address

    No. 26, 6th Road, Science and Technology Entrepreneurship Park, Jianhu County, Jiangsu Province

Contact Now

Lifting of Yipeng integrated sewage lifting pump station

NegotiableUpdate on 04/06
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The integrated sewage lift pump station is an ideal substitute for traditional sewage pump stations
Product Details

The integrated sewage lift pump station is an ideal substitute for traditional sewage pump stations. Usually, traditional pump stations have very strict requirements for planning and construction, requiring every detail to be planned, and the installation of pump stations also requires a lot of manpower, material resources, and time. It is necessary to arrange the construction site and pour concrete, which requires a lot of time to wait for the concrete to harden. Then it is necessary to determine the water inlet point, drill holes, and install the necessary components. It will take at least 2 months to complete these processes. In the construction process of the pump station, it is also necessary to cooperate with contractors of various processes. These unnecessary processes will consume a lot of energy from planners, and the engineering quality of each contractor will also vary.

Domestic sewage has gradually affected our production and life. For some environments with poor conditions, sewage treatment is very difficult. Long term retention still has a significant impact on the overall environment. The Huihong fiberglass winding integrated sewage lifting pump station has effectively played a role in sewage treatment. This device is mainly used in environments low or far from the main pipeline. With its lifting device, the water level is automatically sent to a specific sewage treatment plant for treatment, which not only facilitates the operation process but also greatly benefits environmental changes.

The integrated sewage lifting pump station is mainly used for municipal industrial basement drainage, subway drainage, living areas, factories, and other places below ground level that cannot rely on gravity to directly discharge wastewater into the sewage treatment system, because the sewage in these places remains in one place for a long time, which can easily cause environmental pollution and seriously affect human normal life. By making good use of this device, the problem of sewage can be greatly improved, various environmental pressures can be alleviated, and the overall standard of living can be improved.

The cylinder material of the integrated sewage lifting pump station can be made of thickened medium density fiberglass material or thickened carbon steel material according to user needs. Complete sets of internal accessories such as water pumps, pipelines, valves, instruments, control equipment, etc. It is a new type of integrated pump station equipment that is easy to use, reliable in quality, requires less civil engineering work, and has lower costs. Volume optimization is its most significant feature.

Characteristics of operation and management of integrated sewage pumping station:
1. The stability of the integrated sewage lifting pump station can ensure that the pump station can operate in a "zero maintenance" state;
2. The integrated pump station can realize remote centralized management: provide a centralized database and network server, use GSM/GPRS for data collection, and users can monitor and manage the pump station only with a mobile phone or computer that can connect to the Internet.
3. The dedicated controller can achieve the following functions: calculating the inflow and pumping flow of sewage, daily emptying function, predicting blockage function, overflow record, anti lock function;
4. The integrated pump station collects operating signals through liquid level switches, blockage sensors, water pump temperature sensors, etc., to achieve automated operation of the pump station.

With the integrated sewage lifting pump station, all processes including excavation, backfilling, compaction, connection, leakage testing, control system installation, trial operation, debugging, and document recording can be completed within one or two weeks. This will save 7 weeks of pump station installation time, with a time-saving rate of 80%. More importantly, TPS can solve a series of problems such as leakage and corrosion in traditional pump stations, pump failures, sediment deposition, environmental pollution, frequent maintenance, and high costs. The large-scale integrated sewage lifting pump station produced by our company adopts high-strength wrapped fiberglass GRP cylinder body, continuous high-efficiency N technology pump, self-cleaning pump pit bottom designed by CFD simulation, factory standardized component installation, equipped with intelligent dedicated control system, easy installation, high degree of automation, and less civil engineering workload. It is an ideal substitute for traditional mixed soil transportation pump stations.