-
Phone
15763088987
-
Address
Yeyuan Industrial Park, Linqu County, Weifang City, Shandong Province
Shandong Haizhiyuan Environmental Engineering Co., Ltd
15763088987
Yeyuan Industrial Park, Linqu County, Weifang City, Shandong Province
Several usage methods of external insulation integrated sewage treatment equipment:
1. Capable of treating comprehensive wastewater from living systems and similar organic wastewater;
2. It is made of glass fiber reinforced plastic and stainless steel, and has excellent characteristics such as corrosion resistance and aging resistance, with a service life of more than 50 years;
3. The complete set of equipment is simple to construct and easy to operate. All mechanical equipment is automatically controlled, and all devices can be installed below the surface.
Construction of integrated sewage treatment equipment:
All pipes of the integrated sewage treatment equipment are made of PVC or stainless steel, and the connections between pipes are bonded with PVC adhesive or welded with stainless steel. Suspended biological fillers are used as biological carriers, with high biomass, easy membrane formation, no balling, and no clogging.
Installation and maintenance of integrated sewage treatment equipment:
1. Foundation: If the WSZ series equipment is placed above the floor, only a concrete floor with the same appearance as the equipment needs to be prepared as the foundation. The basic pressure bearing capacity must be greater than 4T/m2, and it is also required to be horizontal and flat. If the equipment is buried below the floor, the foundation elevation must be less than or equal to the equipment elevation and ensure that there is no water accumulation during rain. The foundation is generally made of plain concrete (whether reinforcement is required depends on the local geological conditions).
2. Installation: According to the installation diagram, place each box in place one by one. The position and direction of the boxes should not be misplaced, and the spacing between them should be accurate. The pipes should be connected properly. Inject clean water into the equipment and check for any leaks in the pipes. If not, cover the area around the box with soil until the equipment inspection hole is reached, and level the ground. Connect the control line of the electrical control box to the water pump, and connect the electrical control box to the power supply. When wiring, pay attention to the direction of the fan and motor, which must be the same as the direction pointed by the fan.
Scope of application of integrated sewage treatment equipment:
1. Hotels, restaurants, and sanatoriums;
2. Residential communities, villages, and towns;
3. Stations, highway service areas, seaports, and ships;
4. Factories, mines, troops, tourist attractions, scenic spots;
5. Various industrial organic wastewater similar to domestic sewage, such as the food industry.
Technical parameters of integrated sewage treatment equipment
Several usage methods:
1. Capable of treating comprehensive wastewater from living systems and similar organic wastewater;
2. It is made of glass fiber reinforced plastic and stainless steel, and has excellent characteristics such as corrosion resistance and aging resistance, with a service life of more than 50 years;
3. The complete set of equipment is simple to construct and easy to operate. All mechanical equipment is automatically controlled, and all devices can be installed below the surface.
Construction of integrated sewage treatment equipment:
All pipes of the integrated sewage treatment equipment are made of PVC or stainless steel, and the connections between pipes are bonded with PVC adhesive or welded with stainless steel. Suspended biological fillers are used as biological carriers, with high biomass, easy membrane formation, no balling, and no clogging.
Installation and maintenance of integrated sewage treatment equipment:
1. Foundation: If the WSZ series equipment is placed above the floor, only a concrete floor with the same appearance as the equipment needs to be prepared as the foundation. The basic pressure bearing capacity must be greater than 4T/m2, and it is also required to be horizontal and flat. If the equipment is buried below the floor, the foundation elevation must be less than or equal to the equipment elevation and ensure that there is no water accumulation during rain. The foundation is generally made of plain concrete (whether reinforcement is required depends on the local geological conditions).
2. Installation: According to the installation diagram, place each box in place one by one. The position and direction of the boxes should not be misplaced, and the spacing between them should be accurate. The pipes should be connected properly. Inject clean water into the equipment and check for any leaks in the pipes. If not, cover the area around the box with soil until the equipment inspection hole is reached, and level the ground. Connect the control line of the electrical control box to the water pump, and connect the electrical control box to the power supply. When wiring, pay attention to the direction of the fan and motor, which must be the same as the direction pointed by the fan.
Scope of application of integrated sewage treatment equipment:
1. Hotels, restaurants, and sanatoriums;
2. Residential communities, villages, and towns;
3. Stations, highway service areas, seaports, and ships;
4. Factories, mines, troops, tourist attractions, scenic spots;
5. Various industrial organic wastewater similar to domestic sewage, such as the food industry.