-
E-mail
13824198809@139.com
- Phone
-
Address
Zhuhai City, Guangdong Province
Zhuhai Jiayi Testing Equipment Co., Ltd
13824198809@139.com
Zhuhai City, Guangdong Province
The above prices are for reference only. Interested parties please contact us by phone

|
1. Product Name model |
High and low temperature rapid change test chamber JAY-1175 |
2. Sample description |
This experimental equipment is suitable for: Electricians, electronic products, components, parts and their materials are stored in high and low temperature environments Adaptability testing during storage, transportation, and use. This experimental equipment prohibits: Testing or storage of samples of flammable, explosive, and volatile substances Testing or storage of corrosive substance samples Testing or storage of biological samples Testing or storage of strong electromagnetic emission source samples |
2.2 Water cooling |
The refrigeration adopts water cooling method, which is stable and has low equipment noise. The buyer needs to provide a set of cooling towers and PVC water supply pipes. Flow rate: 25T/h (cooling tower flow rate requirement) The buyer provides soft water and requires: Water pipe: 1/2 "Water pressure: 0.1-0.3 Mpa |
3. Capacity, size, and weight | |
|
3.1. Nominal internal volume 3.2. inside dimensions 3.2. Carton size |
125L Depth 500 x Width 500 x Height 500 mm Depth 1750 x Width 950 x Height 1820 |
4. Performance | |
|
4.1. Test environment conditions 4.2. test method |
Under the conditions of an ambient temperature of+25 ℃, relative humidity ≤ 85%, and no sample in the test chamber Refer to the relevant requirements of national and military standards |
4.3. temperature range |
-40℃→+110℃ |
4.4. temperature fluctuation |
±0.5℃ |
4.5. Temperature deviation |
±2.0℃ |
4.6. heat range |
-20 ℃~+100 ℃ average 10 ℃/min (no load) |
|
4.8. Meet the test criteria Standards and acceptance criteria |
GB/T 2423.1-2001 Test A: Low temperature test method GB/T 2423.2-2001 Test B: High temperature test method GJB 150.3-1986 High Temperature Test GJB 150.4-1986 Low Temperature Test Acceptance criteria comply with: JJF1101-2003 Environmental Testing Equipment Temperature and Humidity Specification GB/T 5170-2008 Acceptance Methods |
5. Structural features | |
5.1. Thermal insulation enclosure structure |
Outer wall material: double-sided galvanized steel plate, surface spray treatment Inner wall material: stainless steel plate SUS304 Box insulation material: rigid polyurethane foam+glass fiber Door insulation material: fiberglass |
5.2. Air conditioning channel |
Centrifugal fans: 2 units, with heaters and evaporators inside the air duct |
|
5.3. Standard configuration of test box place |
Observation window: 1 W240mm × H400mm transparent electric heating film insulated tempered glass (located on the door) including the range of lighting obstruction Lead hole: 1 hole with a diameter of 50mm (located on the left and right sides of the box) Sample rack: 2 layers of stainless steel sample rack, load-bearing capacity (evenly distributed): 50kg/layer Lighting fixtures: 1 11W/AC220V Mobile wheels: 4 |
5.4. door |
Single hinged door (left hinge, right handle), equipped with observation window, lighting Window frame/door frame anti condensation electric heating device |
5.5. control panel |
Korean imported color touch screen controller, over temperature protection setter, power switch |
5.6. machine room |
Refrigeration unit, water tray, drainage hole Condenser fan Condenser inlet filter screen |
5.7. Distribution control cabinet |
Distribution board, exhaust fan |
5.8. heater |
Nickel chromium alloy electric wire heater Heater control method: contactless equal period pulse width modulation, SSR (solid-state relay) |
|
5.9. Power cord holes and Drain hole |
Located on the back of the box |
6. Refrigeration system | |
6.1. way of working |
Water cooled mechanical compression refrigeration method |
6.2. refrigeration compressor |
Famous European and American brand Bizelle low-temperature and high-efficiency semi dense compressor
|
6.3. evaporator |
Finned tube heat exchanger |
6.4. condenser |
Shell and tube air-cooled condenser |
6.5. throttling device |
Capacity controlled freezing system (capillary tube) |
|
6.6. Refrigerator controller type |
The programmable logic controller of the control system automatically adjusts the cooling according to the test conditions Operating conditions of the machine Evaporator Pressure Regulator Compressor return air cooling circuit |
6.7. refrigerant |
R404a (with an ozone depletion index of 0) |
6.8. Component brand |
Refrigeration compressor, French Taikang drying filter, Danish DANFOSS Pressure relay Danish DANFOSS expansion valve Danish DANFOSS Evaporative pressure regulating valve Danish DANFOSS solenoid valve Japanese Eginomiya Electromagnetic valve, liquid mirror, high and low pressure protector, filter, expansion valve, shock absorber, soft connector |
monitor |
7-inch color touch screen |
Operation mode |
Program mode, fixed value mode |
Setting method |
Chinese and English menus, touchscreen input |
Program capacity |
Program editing (capable of writing 120 programs, with a maximum of 99 segments per program) allows programs to be linked and run indefinitely. |
Setting Range |
Temperature measurement range (-90.00 ℃ -20.00 ℃, error ± 0.2 ℃); Humidity measurement range (1.0-100% RH, error<1% RH) |
resolution |
Temperature: 0.01 ℃; Time: 0.01S; (Temperature testing equipment) |
Communication function (optional) |
RS232C/RS485, The longest communication distance is 1.2km [fiber optic can reach 30km] |
control mode |
PT100 sensor; PID control output |
|
On screen curve recording power ability |
SRAM with battery protection, capable of storing device settings, sampling values, and sampling time The engraved time can be observed by sliding in real-time with finger touch on the screen; The default maximum storage time is 60 days (when the sampling period is 1.5 minutes), and the sampling period The sampling time calculation formula can be set by the user as follows: If the sampling period is set to t min, the storage time is d=(65536xt)/60)/24 (Tian) |
7.2. Experimental data collection |
Can be connected to a computer or printer (optional): Configure a printer and set the number of prints according to time To print the test date, set temperature, measured temperature, and measurable humidity within the entire temperature range.
|
Auxiliary functions |
Fault alarm and cause, processing prompt function, power-off protection function, upper and lower temperature protection Protection function, timing function (automatic start and stop operation), self diagnostic function. |
Software usage environment |
IBM PC compatible, with a P Ⅱ or higher CPU, 128MB or more of memory, in Simplified Chinese Windows 2000 or Simplified Chinese Windows XP operating system |
7.3. temperature and humidity measurement |
Swiss Rotronic Universal Temperature and Humidity Sensor Suitable for measuring industrial processes within 200 ℃, the sensor length is 120mm and comes with a 2-meter high-temperature cable. Measure relative humidity, temperature, dew/frost point, and can simulate the output of any two parameters. Measurement range: -100... 200 ℃, 0... 100% RH
|
8. Safety protection device | |
8.1. refrigeration system |
Compressor overheating Compressor overcurrent Compressor overpressure Overheating of condensing fan |
8.2. Chamber |
Adjustable Overtemperature Test space temperature fuse Extreme overheating of air conditioning channel Fan motor overheating |
8.3. other |
Main power phase sequence and phase loss protection Leakage protection Overload and short circuit protection Use the shutdown interlock function when the test chamber door is opened |
9. Other configurations | |
|
9.1. Sample power control Terminal making |
Relay contact control |
|
9.2. Main power leakage Circuit breaker |
AC380V、50Hz、 Three phase four wire+protective earth wire |
10. Attachment | |
10.1. Power cable |
One 2.5-meter cable with five cores (three-phase four wire+protective ground wire) |
10.2. Lead hole |
There are 2 lead holes with a diameter of 100mm |
10.3 Sample rack |
There is a load-bearing capacity of 50kg per floor, with a total of 2 floors |
11. The transportation test box is an integral unit, and the supplier is responsible for the overall transportation | |
12. The user guarantees the following conditions for use | |
12.1. Installation site |
The ground is flat and well ventilated There is no strong vibration around the equipment There is no strong electromagnetic field around the equipment There are no flammable, explosive, corrosive substances or dust around the equipment There is appropriate space for use and maintenance around the equipment, please refer to the instruction manual for details |
12.2. environmental condition |
Temperature: 5 ℃~35 ℃ Relative humidity: ≤ 85% Air pressure: 86kPa~106kPa |
|
12.3. Power supply conditions power supply power capacity Maximum current |
AC380V three-phase four wire+protective ground wire input power: 150KW Voltage allowable fluctuation range: AC (380 ± 38) V Allowable frequency fluctuation range: (50 ± 0.5) Hz The grounding resistance of the protective grounding wire is less than 4 Ω Require users to configure corresponding capacity air or power switches for the equipment at the installation site, and And this switch must be used independently for this device |
|
12.4. Regarding the storage environment The requirements |
When the equipment is not working, the temperature of the environment should be maintained within 0 ℃ to+45 ℃ When the ambient temperature is below 0 ℃, the water remaining in the equipment should be drained completely to prevent pipe damage The water inside the road freezes and swells, damaging the pipeline. |
13.1. Installation and commissioning |
After the buyer prepares the necessary external conditions for the equipment (such as water, electricity, etc.), the company engineer may, Responsible for the installation, debugging, and startup of the equipment, and providing excellent technical support After sales service and on-site equipment training for users to ensure that trainees can Capable of independently and proficiently operating equipment and completing simple maintenance work, daily equipment maintenance, etc Work. |
13.2. warranty |
The warranty period of the equipment is one year, and the official effective date is the buyer's acceptance of the equipment The calculation starts from the date of signature on the book. During the warranty period, the seller is responsible for the equipment due to its own Responsible for resolving various malfunctions caused by personal reasons free of charge. Outside the warranty period, the The maintenance work of equipment requires the cost of spare parts and a certain service fee. |
13.3. maintenance |
The repair response time is within 2 hours After receiving the buyer's fault notification, the seller guarantees to respond within 2 hours and compete Eliminate the fault as soon as possible in the shortest possible time. |
|
13.4. Lifetime service items eye |
The seller promises to provide the equipment free of charge and indefinitely during its use Technical support work. |