-
E-mail
bjtz@flexibletz.com
- Phone
-
Address
No. 16 Nantong Road, Daxing Industrial Development Zone, Beijing
Beijing Aerospace Taizhou Pipeline Equipment Co., Ltd
bjtz@flexibletz.com
No. 16 Nantong Road, Daxing Industrial Development Zone, Beijing
![]() |
1、 Product usage and characteristics
Prefabricated double-layer insulated stainless steel chimney (stainless steel exhaust pipe, flue) has the advantages of easy installation, thermal insulation, beauty, light weight, maintenance free, and long service life. Widely used for the emission of flue gas, gas, and exhaust gas from equipment such as boilers, wall mounted boilers, and direct fired units.
2、 Applicable working conditions
Circular chimney diameter: DN100mm -2000mm
Rectangular chimney diameter: any size.
Working temperature: 0 ℃ -760 ℃
Media: smoke, gas, exhaust gas
3、 Structure and Materials
![]() |
![]() |
| Prefabricated double-layer insulated stainless steel chimney (inner layer+outer layer) | The thickness of chimney insulation layer includes: 25mm, 50mm, 75mm, 100mm |
1. Inner layer of chimney: stainless steel 201, 202, 304, 316L, 321, 430, etc
2. Outer layer of chimney: stainless steel 201, 202, 304, 430, galvanized steel plate, aluminum plate, etc
3. Insulation material: Silicon aluminum fiber felt
4. Clamp: Stainless steel
5. Bracket: Carbon steel, stainless steel
4、 Product code example

5、 Schematic diagram of spare parts for double-layer stainless steel chimney
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Chimney straight pipe |
30 degree misalignment joint |
30 degree elbow |
45 degree misaligned joint |
45 degree tee |
90 degree tee |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
90-degree elbow |
90 degree reducing tee |
bellows expansion joint |
Chimney short straight pipe |
Riot seat (riot door) |
Riot seat (riot film) |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
end cover |
Rain proof skirt |
clamp |
reducing coupling |
Flat guide bracket |
Waist brace |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Flexible flexible joint |
Boiler connecting pipe |
Growth rate management |
reducer |
Flat fixed bracket |
Wall fixed bracket |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Umbrella shaped rain hat |
Zipper regulating valve |
Mushroom shaped rain hat |
drain pipe |
Wall guide bracket |
Circular hanger |
![]() |
![]() |
![]() |
![]() |
![]() |
|
manual regulating valve |
45-degree elbow |
telescopic tube |
Drainage bottom cover |
Active circular hanger |
6、 Installation legend