Welcome Customer !
ybzhanCorporate NewsThe Shanghai Rain Test Chamber is a commonly used test chamber product

  Shanghai Rain Test ChamberMainly suitable for waterproof performance testing and IP waterproof level testing of communication products, automotive components (such as car mirrors, car speakers, car electronics, car lighting, car lamps, motorcycle lamps, motorcycle mirrors), outdoor lighting and signal devices, and other products. Box type Shanghai rain test box, waterproof test box, and waterproof testing machine structure; Both the inner and outer boxes of the waterproof test chamber are made of SUS304 stainless steel plate. The water tank is made of SUS304 stainless steel plate and has a low position and full water indication. The spray pipe is made of seamless stainless steel pipe, and the turntable is made of stainless steel. The nozzle is detachable and equipped with a plug, which is convenient for customers to replace according to the required number of spray holes. There is one 50mm lead hole on the side of the test chamber body, which is convenient for customers to use under load. The Shanghai Rain Test Chamber is a commonly used test chamber product, suitable for external lighting and signal devices, as well as protection of automotive lamp housings. It can provide realistic simulation of various environments such as water and spray tests that electronic products and their components may be subjected to during transportation and use.

  Shanghai Rain Test ChamberNotes:
1. If you hear any abnormal noise during operation, please stop the machine for inspection and wait for the fault to be found and resolved before restarting to avoid affecting the service life of the equipment.
2. The transmission mechanism must be regularly oiled, and the reducer must be filled with clean 20 # engine oil.
3. After the equipment is positioned, the support frame needs to be lifted to prevent the wheels from shifting due to vibration during equipment testing.
4. The box type Shanghai rain test chamber has been running for a long time. If the spray hole is found to be blocked, the pipeline must be removed, rinsed with tap water, and then reassembled.
The Shanghai rain test chamber is exposed to the environment for a long time, and the instruments, distribution boards, water circuits, etc. in the distribution room will accumulate dust. When the air is humid, it can cause equipment failure. To ensure the long-term stable operation of the equipment, please clean the distribution room once a month. (Warning: When performing this operation, please turn off the main power switch first to avoid electric shock accidents!) Method: Turn off the main power switch first,Shanghai Rain Test ChamberOpen the distribution room cover, use a vacuum cleaner (or soft brush, vacuum cleaner) to clean the dust from the electrical parts, cover the distribution room cover with Z, and tighten the fastening screws.
Latest News