Polyacrylamide Cost-Performance Analysis: High Efficiency at Direct Factory Rates
Winning the bid for the flow meter project of the coal-fired boiler at Xinjiang Tunxin Energy Power Plant
Our company has won the bid for the flow measurement system of the 35T/h mechanical wind power chain furnace renovation circulating fluidized bed furnace project of Xinjiang Tunxin Energy Development Co., Ltd. Power Plant. There are currently 3 × 6MW units equipped with three 35T/h coal-fired boilers, of which 3#The furnace is a 35T/h circulating fluidized bed furnace, which was put into operation in May 2007#、 two#The furnace is a 35T/h mechanical wind chain furnace. After this renovation, based on the current coal price of 135 yuan/ton, it can save 2.754 million yuan in coal costs. At the same time, the large fans used in the circulating fluidized bed furnace are all variable frequency technology, and the energy-saving rate is calculated at 25% (energy-saving range of 15-45%). The annual energy-saving is about 600000 yuan, and the service life of large motors is guaranteed, reducing equipment maintenance rate. The use of circulating fluidized bed furnaces has increased the equipment's service life and achieved significant intangible benefits. At the same time, the generated slag and fly ash are utilized by industries such as building materials and construction, reducing pollutant emissions.
,












