Welcome Customer !

Membership

Help

Shanghai Chengsi Intelligent Technology Co., Ltd
Custom manufacturer

Main Products:

ybzhan>Products
Product Categories

Shanghai Chengsi Intelligent Technology Co., Ltd

  • E-mail

    671113565@qq.com

  • Phone

    13761235453

  • Address

    No. 265 East Street, Zhuangxing Town, Fengxian District, Shanghai

Contact Now

Accurate detection data of radiator gravel impact testing machine

NegotiableUpdate on 11/20
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The radiator gravel impact testing machine has accurate detection data. Suitable for gravel impact testing of automotive radiators. Test standard QC/T 468 "Automotive Radiators"

Product Details

Accurate detection data of radiator gravel impact testing machine Accurate detection data of radiator gravel impact testing machine

1summary:

Suitable for gravel impact testing of automotive radiators.

2、 Testing standards

QC/T 468 "Automotive Radiators"

3、 Equipment testing and principle introduction

Principle:

Gravel or other media are placed in the feeding hopper, and the vibrating feeding device in the hopper sends the material to the feeding chute. The vacuum generated by the high-speed air below causes the medium to fall into the feeding chute. The medium is sucked into the nozzle and emitted onto the sample by the air injector. The medium collided with the sample and fell into the gravel box.

Experiment:

The test object is the radiator core part, which is sprayed continuously, usually only once.

The hardness of the quenched steel shot is 61HRC~65 HRC, with sharp edges and an average diameter of 4mm~5m.

The specific experimental parameters are specified in Table 11.

散热器碎石冲击试验机 检测数据精准

Equipment appearancegesture, signal, indicateimage(Customization of external sample parts, details may vary depending on the actual product

4、 Working conditions and venue requirements

Working conditions:

1. Operating temperature: room temperature

2. Power supply: AC/single-phase 220V ± 15%/50Hz

3. Compressed air pressure: 0.4MPa~0.8MPa (user can customize, higher pressure can also be customized to meet testing conditions)

Venue requirements:

1. The ground is flat and well ventilated

2. Free from flammable, explosive, corrosive gases and dust

3. There is no strong electromagnetic radiation source nearby

4. Ground bearing capacity of the venue: not less than 300kg/m2

Electrical requirements

1. The equipment design conforms to the principle of human-machine interaction, with convenient and safe operation, and overall firmness and reliability;

2. The equipment is equipped with a power cut-off valve to ensure that there is no danger during maintenance;

3. The operation control system is placed in a location that is convenient for the operator to operate and observe. Equipment BI must be equipped with an emergency stop button;

4. The equipment should have good and QUAN surface safety protection measures, and the rotating parts, dangerous components, and dangerous parts on the equipment should have protective devices and safety signs;

5. The electrical control system of the equipment has overload protection and short circuit protection functions.

5、 Technical parameters

PLC control system

Operation interface: Switch between Chinese and English;

Testing software: can be remotely upgraded for free

The spraying time can be set from 0-999 seconds and a pause time can be set during spraying

funnelMade of stainless steel

The control system and sample box are separable, flexible, and can be moved to any position as desired

additional allocationPneumatic vibration system

Jet mediumcustomer-provided

One set of sample device: customized sample size: ZUI large 1200mm*1200mm*68mm (length and width), ZUI small size: 300 * 300 * 32mm;

Sample holder: manually move the sample, manufacture material steel pipe welding;

Sample weight: 20-30KG

Particle size: 45 degree gun-0-29mm and 90 degree gun0-52mm

Spray speed adjustable from 0-1MPA

Adjustable emission quantity

Pressure regulation range0-1000KPa

Emission adjustment range ≥ 1kg/min

Launch angle adjustment range of 45-90 °;

Dimensions: 2930 * 2680 * 2050mm

6、 Supply List

host1 unit

1 set of sample device

Silencing component、SAE spray gun components、VDA spray gun components1 set

1 eye mask

1 earphone

Steel ball 500g

1 set of wrench

1 power cord

1 copy of instruction manual

1 certificate of conformity

1 warranty card

One nameplate

7、 Equipment configuration

散热器碎石冲击试验机 检测数据精准

8、 Installation, debugging, training, and acceptance

1. After the goods arrive at the demand side, both parties shall jointly confirm the integrity of the goods. The supplier shall deliver the equipment to the location designated by ZHI for installation and commissioning according to the demand side's requirements.

2. The supplier shall provide free training for the relevant personnel of the demander. The content includes the normal use, maintenance, fault analysis and troubleshooting, operational safety, and emergency handling procedures of the equipment.

3. Equipment acceptance: After receiving the equipment, the purchaser shall conduct acceptance according to the technical agreement signed by both parties. The equipment acceptance shall meet the standard requirements and achieve normal performance before completion. Both parties shall issue an acceptance report.

9、 After sales warranty period and service

1. SupplierThe quality assurance period for its equipment is 12 months, calculated from the date of acceptance or deemed acceptance.

2During the warranty period, if the supplied equipment encounters quality problems within the operating procedures (except for human factors caused by Party A or force majeure),supplierResponsible for free maintenance of equipment until the end of the warranty period.

3After the warranty period, Party B shall still be responsible for repairing and maintaining the equipment, but only reasonable working hours and transportation expenses shall be charged. For the replacement and purchase of equipment related accessories, Party B shall only charge the cost of the accessories.




‍

1summary:

Suitable for gravel impact testing of automotive radiators.

2、 Testing standards

QC/T 468 "Automotive Radiators"

3、 Equipment testing and principle introduction

Principle:

Gravel or other media are placed in the feeding hopper, and the vibrating feeding device in the hopper sends the material to the feeding chute. The vacuum generated by the high-speed air below causes the medium to fall into the feeding chute. The medium is sucked into the nozzle and emitted onto the sample by the air injector. The medium collided with the sample and fell into the gravel box.

Experiment:

The test object is the radiator core part, which is sprayed continuously, usually only once.

The hardness of the quenched steel shot is 61HRC~65 HRC, with sharp edges and an average diameter of 4mm~5m.

The specific experimental parameters are specified in Table 11.

散热器碎石冲击试验机 检测数据精准

Equipment appearancegesture, signal, indicateimage(Customization of external sample parts, details may vary depending on the actual product

散热器碎石冲击试验机 检测数据精准

4、 Working conditions and venue requirements

Working conditions:

1. Operating temperature: room temperature

2. Power supply: AC/single-phase 220V ± 15%/50Hz

3. Compressed air pressure: 0.4MPa~0.8MPa (user can customize, higher pressure can also be customized to meet testing conditions)

Venue requirements:

1. The ground is flat and well ventilated

2. Free from flammable, explosive, corrosive gases and dust

3. There is no strong electromagnetic radiation source nearby

4. Ground bearing capacity of the venue: not less than 300kg/m2

Electrical requirements

1. The equipment design conforms to the principle of human-machine interaction, with convenient and safe operation, and overall firmness and reliability;

2. The equipment is equipped with a power cut-off valve to ensure that there is no danger during maintenance;

3. The operation control system is placed in a location that is convenient for the operator to operate and observe. Equipment BI must be equipped with an emergency stop button;

4. The equipment should have good and QUAN surface safety protection measures, and the rotating parts, dangerous components, and dangerous parts on the equipment should have protective devices and safety signs;

5. The electrical control system of the equipment has overload protection and short circuit protection functions.

5、 Technical parameters

PLC control system

Operation interface: Switch between Chinese and English;

Testing software: can be remotely upgraded for free

The spraying time can be set from 0-999 seconds and a pause time can be set during spraying

funnelMade of stainless steel

The control system and sample box are separable, flexible, and can be moved to any position as desired

additional allocationPneumatic vibration system

Jet mediumcustomer-provided

One set of sample device: customized sample size: ZUI large 1200mm*1200mm*68mm (length and width), ZUI small size: 300 * 300 * 32mm;

Sample holder: manually move the sample, manufacture material steel pipe welding;

Sample weight: 20-30KG

Particle size: 45 degree gun-0-29mm and 90 degree gun0-52mm

Spray speed adjustable from 0-1MPA

Adjustable emission quantity

Pressure regulation range0-1000KPa

Emission adjustment range ≥ 1kg/min

Launch angle adjustment range of 45-90 °;

Dimensions: 2930 * 2680 * 2050mm

6、 Supply List

host1 unit

1 set of sample device

Silencing component、SAE spray gun components、VDA spray gun components1 set

1 eye mask

1 earphone

Steel ball 500g

1 set of wrench

1 power cord

1 copy of instruction manual

1 certificate of conformity

1 warranty card

One nameplate

7、 Equipment configuration

散热器碎石冲击试验机 检测数据精准

8、 Installation, debugging, training, and acceptance

1. After the goods arrive at the demand side, both parties shall jointly confirm the integrity of the goods. The supplier shall deliver the equipment to the location designated by ZHI for installation and commissioning according to the demand side's requirements.

2. The supplier shall provide free training for the relevant personnel of the demander. The content includes the normal use, maintenance, fault analysis and troubleshooting, operational safety, and emergency handling procedures of the equipment.

3. Equipment acceptance: After receiving the equipment, the purchaser shall conduct acceptance according to the technical agreement signed by both parties. The equipment acceptance shall meet the standard requirements and achieve normal performance before completion. Both parties shall issue an acceptance report.

9、 After sales warranty period and service

1. SupplierThe quality assurance period for its equipment is 12 months, calculated from the date of acceptance or deemed acceptance.

2During the warranty period, if the supplied equipment encounters quality problems within the operating procedures (except for human factors caused by Party A or force majeure),supplierResponsible for free maintenance of equipment until the end of the warranty period.

3After the warranty period, Party B shall still be responsible for repairing and maintaining the equipment, but only reasonable working hours and transportation expenses shall be charged. For the replacement and purchase of equipment related accessories, Party B shall only charge the cost of the accessories.