-
E-mail
2663596212@qq.com
-
Phone
13621915063,13681929324
-
Address
No. 14, Lane 466, Jiangyang South Road, Zhabei District
Shanghai Shengxu Electric Co., Ltd
2663596212@qq.com
13621915063,13681929324
No. 14, Lane 466, Jiangyang South Road, Zhabei District
Complete set of equipment for voltage withstand test of insulated boots and gloves - QualityImproved testing speed. More reliable identification of leakage current, insulation aging, power frequency withstand voltage and other parameters of insulated boots (gloves)
working principle:
Complete set of equipment for voltage withstand test of insulated boots and gloves - QualityConnect the power supply of 0~220V, adjust the power frequency withstand voltage test bench, and according to the electromagnetic induction principle of the test transformer, generate a power frequency high voltage of 0~30KV from the transformer to each electrode, so that the insulation boots (gloves) can obtain the specified test voltage. According to the testing procedure for insulated boots (gloves), read and record the test parameters.
Function Introduction:
1. Split design, maximum test voltage of 40kV.
2. Digital voltage and current display function, direct and accurate reading of test data.
3. It has a timing function.
4. Test sample breakdown protection.
5. Capable of conducting pressure tests on a single boot or glove, or conducting pressure tests on six boots simultaneously, very suitable for on-site sampling and testing
Product details:
1. Sink: (length) 1040 × (width) 680 × (depth) 390;
2. Base: (length) 1010 × (width) 650 × (depth) 330;
3. Voltage resistance: 3KV/1min;
4. Test quantity: 5 pairs per time;
5. Weight: 80Kg.
usage method:
It consists of two main parts: a water tank test and a base. After unpacking the two parts of the packaging box, place the slot part on the base and tighten the grounding screw to ensure good contact with the sink.
During the experiment, the tank should be filled to about 2/3, and the insulated boots (gloves) should be placed in the high-voltage electrode clamp to balance and suspend them. The inside of the insulated boots (gloves) should be filled with water, but the surface should not be higher than 5CM below the mouth of the insulated boots (gloves). And ensure that the exposed part of the insulated boots (gloves) remains dry and clean. Then adjust the electrode rod by locking the screw to insert the electrode into the insulating boot (glove). Shake the handle and lower the insulated boots (gloves) to the same position on both the inside and outside.