Insulated boots and gloves tester, live protective tool, insulation test bench

NegotiableUpdate on 12/11
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
Description: Insulation boot glove tester with live protective tool insulation test bench. During the testing process, the operator should operate at a safe distance (less than 20KV per meter in air). The power frequency withstand voltage test bench must be reliably grounded with a grounding resistance of less than 0.1 Ω.
Product Details

Insulated boots and gloves tester, live protective tool, insulation test benchDuring the testing process, the operator should operate at a safe distance (less than 20KV per meter in air), and the power frequency withstand voltage test bench must be reliably grounded with a grounding resistance of less than 0.1 Ω.

matters needing attention:

During the testing process, the operator should operate at a safe distance (less than 20KV per meter in air), and the power frequency withstand voltage test bench must be reliably grounded with a grounding resistance of less than 0.1 Ω.

2.Insulated boots and gloves tester, live protective tool, insulation test benchBefore use, the insulation resistance should be tested, and the insulation resistance value should be greater than 2M Ω.

Before use, check whether the contacts of each electrical component are loose, whether the contact is good, and whether each protection system can work normally.

Before use, the insulation rod, electrode, electrode rod, water tank and other parts should be wiped with alcohol.

After the experiment is completed, the water should be drained and all parts should be wiped dry with a cotton cloth. If not in use for a long time, store the sink, electrode rod, and insulation support rod in a dry and ventilated place.

Experimental steps:

1. Add two-thirds of the water into the sink and fix it on an insulated countertop.

2. Place the insulated boots and gloves with water added into the sink, clamp the insulated gloves with the insulation clip on the probe, and do not wet the upper opening of the insulated boots and gloves. Keep the upper opening of the insulated boots and gloves dry.

3. Adjust the tension on the high-voltage pipe, insert the probe into the water inside the insulated boots and gloves, and tighten the tension to secure the probe.

4. Connect the sink box to the ground, connect the sink box socket to the control box output socket, and turn each milliampere meter switch on the sink box to the 'off' position.

5. Connect the power socket of the control box to a 220V power supply and ground the grounding terminal.

6. Set the test time and overcurrent protection value.

Product details:

1. Sink: (length) 1040 × (width) 680 × (depth) 390;
2. Base: (length) 1010 × (width) 650 × (depth) 330;
3. Voltage resistance: 3KV/1min;
4. Test quantity: 5 pairs per time;
5. Weight: 80Kg.

After sales service system:
Our company has a professional after-sales service team, and the after-sales service department is led by the deputy general manager in charge of sales.
2. The after-sales service department currently has 10 personnel who can ensure timely maintenance of the company's products.
Our goal for after-sales service is to promptly resolve on-site equipment malfunctions, respond quickly, and provide top-notch service!