Welcome Customer !

Membership

Help

Nanjing Huachao Power Technology Co., Ltd
Custom manufacturer

Main Products:

ybzhan>Products
Product Categories

Nanjing Huachao Power Technology Co., Ltd

  • E-mail

  • Phone

    13260986888、13813930310

  • Address

    No. 266 Chuangyan Road, Qilin High tech Industrial Development Zone, Nanjing City

Contact Now

Liebert GXE series (1-10KVA)

NegotiableUpdate on 10/08
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The Vertiv Liebert GXE series UPS is a new generation tower type, single in single out, online high-performance UPS product developed and produced based on the application dynamics of AC uninterruptible power supply in the IT industry, using a new topology. By highlighting performance and environmental characteristics, it meets the latest applications of IT equipment in small and medium-sized computer rooms, comprehensively enhancing the commercial competitiveness of low-power tower UPS. The breakthrough ultra compact design is 30%~70% smaller than similar products, with a large LCD display and more

Product Details

Vertiv


The Liebert GXE series UPS is based on the application dynamics of AC uninterruptible power supply in the IT industry. It adopts a new topology and is developed and produced as a new generation of tower type, single in single out, online high-performance system


UPS products. By highlighting performance and environmental characteristics, it meets the latest applications of IT equipment in small and medium-sized computer rooms, comprehensively enhancing the commercial competitiveness of low-power tower UPS
feature
Breakthrough ultra compact design: 30%~70% smaller in volume compared to similar products
Large LCD display for more direct and convenient settings
The input voltage is 120-288V, and the output does not decrease, greatly reducing the probability of battery conversion and improving the battery (1-3KVA)
Super overload capacity: Under the rated mains power, 130% can last for 10 minutes, 150% can last for 1 minute, meeting the customer's requirements for sudden load increase (1-3KVA)