1. Basic requirements for water tank
The geometric dimensions of concrete foundation shall be formulated in accordance with the relevant provisions of GB02S101.
The height difference of the concrete foundation plane is less than 5mm
2. Installation, construction, and acceptance of water tanks
Professional welders perform on-site argon arc welding.
There is a standard power supply on the construction site. There is a maintenance space of ≥ 500mm around the water tank.
Appearance inspection shows no rust or pollution: Fill the box with water for 2-3 hours, and if there is no obvious deformation or leakage in the welds, it is considered qualified.
3. The use, maintenance, and upkeep of water tanks
When piping, do not apply excessive load to the inlet and outlet of the piping.
Do not directly apply the weight of valves and large-diameter pipes to the water tank inlet. If necessary, set up pipe supports:
Expansion, contraction, and vibration of welded pipes must be equipped with flexible expansion joints.
4. Water tank configuration and supporting accessories
Our company's water tank supply scope includes box bodies, lockable manholes, ladders, short pipes, and single piece flanges.
Our company can also provide supporting accessories according to user requirements, such as float valves, glass tube level gauges, and various water tank disinfection equipment.